New Division Street bridge open ahead of schedule

SHARE New Division Street bridge open ahead of schedule

A new interim bridge over the Chicago River at Division Street opened to traffic Tuesday, roughly two weeks ahead of schedule, transportation officials announced.

It replaces an original bridge built in 1903 that was demolished this summer because of its deteriorated condition, the Chicago Department of Transportation said.

“The historic bridge had been in service for more than a century as a key transportation link across Goose Island for cars, trains, bikes and pedestrians,” CDOT Commissioner Rebekah Scheinfeld said in a release.

The interim bridge will serve as a replacement until a permanent moveable bridge can be built, officials said.

The Latest
Fifty years to the day since Title IX was signed into law, the longtime basketball coach remembered the women in his life who taught him to be the man he is.
Police have asked people to avoid the area of Remington Blvd. and Woodcreek Drive.
The personnel moves are too much to keep track of and absolutely exhausting, and that’s just for those of us lazing on the sofa.
However you’re logging your steps, the data from your device can be hard to interpret.
Terry wasn’t expected to go in the first round until the 20s, so jumping up to No. 18 overall had to make the Arizona product feel good. Not as good as at least five other teams that at least on paper had great drafts.