Illinois Tollway OKs $106M for Tri-State rebuilding plans

SHARE Illinois Tollway OKs $106M for Tri-State rebuilding plans

CHICAGO — The Illinois Tollway has awarded $106 million in contracts to begin planning for a major rebuilding of the Tri-State Tollway near Chicago.

The Tollway plans to reconstruct 22 miles of the Tri-State over a two-year period beginning in 2020. The stretch is the Tollway’s heaviest-traveled section with the heaviest congestion.

The Chicago Tribune reports (http://trib.in/1HMPphr) the latest cost estimate for the project is $1.7 billion, but that could go higher if lanes are added. The project is part of the $12 billion capital program that the Tollway launched with funding from a 2012 toll increase.

The agency says the highway, built in 1958, carries as many as 200,000 vehicles per day. The Tri-State generates 45 percent of the Tollway system’s $1 billion annual toll revenue.

The Latest
It was the fifth loss in a row and 11th in the last 12 games for the Sox, who plummeted to 3-20.
By pure circumstance, USC quarterback Caleb Williams was on the same flight to Detroit on Tuesday as Washington wide receiver Rome Odunze. Time will tell whether they’re on the same flight out of Detroit — and to Chicago — on Friday morning.
Harrelson says he feels bad for chairman Jerry Reinsdorf, too.
The Cubs also provided an update on outfielder Cody Bellinger’s midgame injury.