Fire breaks out at West Loop Starbucks

“The fire was contained to the Starbucks, and it looks like everything is under control,” the fire department said.

SHARE Fire breaks out at West Loop Starbucks
The fire department responded Oct. 10, 2019, for a blaze at a Starbucks at 150 N. Riverside.

The fire department responded Oct. 10, 2019, for a blaze at a Starbucks at 150 N. Riverside.

Alison Martin/Sun-Times

No one was injured Thursday when a fire broke out at a Starbucks along the Chicago River in the West Loop.

Firefighters were called about 12:20 p.m. for a fire in the coffee shop in the lobby of the high-rise at 150 N. Riverside Plaza, according to Chicago Fire Dept. spokesman Larry Langford.

“The fire was contained to the Starbucks, and it looks like everything is under control,” Langford said. He said the sprinkler system was engaged and the fire was put out within the hour.

A preliminary investigation indicates the fire may have started in the brewing machine or dishwasher, Langford said.

Several ambulances and fire engines were called to the site as a precaution, and crews remained on scene after the fire was extinguished to douse the burned area, Langford said.

Employees in the building were ordered to shelter in their offices, since evacuating a building so large would be unnecessary in this case, Langford said. Some people, however, evacuated on their own.

The cause of the fire is under investigation, Langford said.

The Latest
Mexican Independence Day celebrations offer a glimpse of the size and growth of the community in the Chicago area.
While Texans fans can dare to dream with Stroud showing early flashes — 280 passing yards and a 118.7 rating in an upset of the Jaguars — Bears fans are left with an age-old lament: Why is developing a quarterback at Halas Hall always like pulling teeth?
The All-Star center fielder lands on the injured list with a sprained left knee; White Sox recall OF Tyler Naquin from Charlotte.
The complaint is the result of a years-long investigation into Amazon’s businesses and one of the most significant legal challenges brought against the company in its nearly 30-year history.
The final phase begins in October with the replacement of northbound tracks between Belmont and Cornelia avenues. Construction goes through 2025.